RECONSTRUCTION OF THE CONCRETE LINING OF THE MINE SHAFT № 3 OF BEREZNIKI POTASH PLANT AND MINE 2 OF URALKALI PJSC IN CONDITIONS OF CONTINUOUS PRODUCTION

There is a short description of mine shaft sinking and lining of Berezniki potash plant and mine 2 (BKPRU-2) in the interval of saliferous rocks. Main defects of monolith concrete lining of vertical mine shafts in Verkhnekamskoye potash salt deposit have been considered. Based on the results of mine surveys and presented samples main reasons of the concrete lining destruction in the area of the shaft junction with level workings have been analyzed. Main reasons of destruction of the monolith concrete lining of the mine shaft № 3 of BKPRU-2 are presented in detail. Results of the performed local emergency recovery work in concrete section of the shaft № 3 are specified. Feasibility of cast-iron tubbing use instead of the destructed concrete lining is presented. A comparison of layout of stages and preventive floors (scaffolding) has been performed, which are used directly by operation in the shaft № 3 contrary to layouts applied in the shafts № 1 and № 2 of BKPRU-2. Also main stages of the carried out reconstruction of the concrete lining in conditions of continuous production are presented taking into account daily maintenance works in complex of mine hoisting of the shaft № 3 subject to the process procedure.

Keywords

Mine shaft, concrete lining, cast iron-concrete lining, ventilation, salt massif, deformation.

Issue number: 9
Year: 2016
ISBN:
UDK: 622.283
DOI:
Authors: Tarasov V. V., Ivanov O. V.

About authors: Tarasov V.V., Head of Laboratory, e-mail tarasov@gallurgy.ru, Ivanov O.V., Leading Engineer, e-mail Ivanov.Oleg@gallurgy.ru, Open Joint Stock Company Ural Research and Development Institute of Halurgy (Galurgia OJSC), 614002, Perm, Russia.

REFERENCES: 1. Tekhnicheskiy pasport shakhtnogo stvola № 3 rudnika BKPRU-2 OAO «Uralkaliy»: otchet o NIR. OAO «Galurgiya» (Technical data sheet of the mine shaft № 3 of Berezniki potash plant and mine 2 of Uralkali OJSC, report on research work, Galurgia OJSC), Perm, 2013, 30 p.
2. Rekomendatsii po vypolneniyu kompleksa rabot dlya dal’neyshey bezavariynoy ekspluatatsii stvola № 3 rudnika BKPRU-2: otchet o NIR. OAO «Galurgiya» (Recommendations on performance of the works complex for further accident-free operation of the shaft № 3 of Berezniki potash plant and mine 2, report on research work, Galurgia OJSC), Perm, 2010, 36 p.
3. Obosnovanie neobkhodimosti likvidatsii sopryazheniya stvola № 3 rudnika BKPRU-2 s plastom AB. OAO «Galurgiya» (Statement of need to liquidate a junction of the shaft № 3 with AB seam of Berezniki potash plant and mine 2, Galurgia OJSC), Perm, 2002, 14 p.
4. Konstantinova S. A., Bolikov V. E. Prognoz i obespechenie ustoychivosti kapital’nykh gornykh vyrabotok (Forecast and sustaining capital mining), Ekaterinburg, IGD UrO RAN, 2003, 274 p.
5. Ol’khovikov Yu. P. Krep’ kapital’nykh vyrabotok kaliynykh i solyanykh rudnikov (Support of permanent workings in potash and salt mines), Moscow, Nedra, 1984, 238 p.