USE OF ECONOMIC INDICATORS IN MEDIUM-TERM MINE PLANNING IN GEOLOGICAL AND MINING INFORMATION SYSTEM MICROMINE

Geological and mining information systems enjoy increasingly wider application at modern mines, and expert use of functions of bundled software as well as development of the appropriate procedures is thus a very important and topical problem. The article describes the medium-term underground mine planning procedure in geological and mining information system Micromine in terms of a copper deposit under development using the room-and-pillar method. An emphasis is laid on accounting for various economic indicators when determining mining sequence and technology. The list of required data for implementing the procedure in underground mine planning in Micromine is presented. The proposed procedure allows the key performance indicators and the selected mining advance efficiency to be identified and evaluated at the stage of mine planning. The effect of the developed procedure is illustrated and the examples of report documentation in geological and mining information system Micromine are given.

Keywords

Geological and mining information system, Micromine, planning, economic indicators, mine, optimization, production engineering.

Issue number: 8
Year: 2018
ISBN:
UDK: 622.1:528.952
DOI: 10.25018/0236-1493-2018-8-0-208-216
Authors: Protsenko A. V., Bayrov Zh. B., Fedotov G. S., Zartenova L. G.

About authors: Protsenko A.V. (1), Graduate Student, Bayrov Zh.B., Mining Engineer Consultant, LLP «Micromine Central Asia», Almaty, Kazakhstan, Fedotov G.S. (1), Graduate Student, Zartenova L.G., Candidate of Technical Sciences, Assistant Professor, Project Manager «For implementation of Cognos system», «Kazakhmys Corporation» LLP, Karaganda, Kazakhstan, 1) National University of Science and Technology «MISiS», 119049, Moscow, Russia, e-mail: ud@msmu.ru.

REFERENCES:

1. Kaputin Yu. E. Sistemy kontrolya soderzhaniy (Grade conrol) na gornykh predpriyatiyakh [Grade control in mines], Saint-Petersburg, Nedra, 2012, 330 p.

2. Protsenko A. V., Bayrov ZH. B., Zartenova L. G., Protsenko N. V. Algoritm operativnogo planirovaniya na rudnikakh s ispol'zovaniem PO MICROMINE. Ekonomika i upravlenie v XXI veke: Tendentsii razvitiya [Algorithm of operational mine planning with Micromine program support. Economy and control in the 21st century: Development trends]. Sbornik materialov XXXVII Mezhdunarodnoy nauchno-prakticheskoy konferentsii. Novosibirsk: OOO «Tsentr razvitiya nauchnogo sotrudnichestva», 2017, pp. 143—149. [In Russ].

3. Protsenko A. V., Zartenova L. G. Vnedrenie sovremennykh tekhnologiy v planirovanie gornykh rabot v TOO «Korporatsiya Kazakhmys», Respublika Kazakhstan [Introduction of advanced technologies in mine planning at Kazakhmys Corporation, Republic of Kazakhstan]. Problemy osvoeniya nedr v KHKHI veke glazami molodykh: sbornik materialov 11 Mezhdunarodnoy nauchnoy shkoly molodykh uchenykh i spetsialistov], Moscow, IPKON RAN, 2014, pp. 337—340. [In Russ].

4. Official site Micromine, available at: http://www.micromine.ru/micromine-mining-software (accessed 01.05.2018).

5. Kaputin Yu. E. Informatsionnye tekhnologii planirovaniya gornykh rabot (dlya gornykh inzhenerov) [Information technologies for mine planning (for mining engineers)], Saint-Petersburg, Nedra, 2004, 334 p.

6. Kaputin Yu. E. Povyshenie effektivnosti upravleniya mineral'nymi resursami gornoy kompanii (geologicheskie aspekty) [Increase in efficiency of mineral resources management at a mining company (geological aspects)], Saint-Petersburg, Nedra, 2013, 246 p.

7. Rendu J. M. 2014. An introduction to cut-off grade estimation. Second edition (SME). 159 p.

8. Poniewierski J. 2016. Negatively Geared Ore Reserves — A Major Peril of the Break-even Cut-off Grade. (Project Evaluation 2016 / Adelaide, SA, 8–9 March 2016): 1—12 p.

9. Jack de la Vergne 2014. Hard Rock Miner’s Handbook. Edition 5. 314 p.

10. John Chadwick April 2017. International mining. Tomorrow’s underground mine. 10—28 p.

11. Lomonosov G. G. Proizvodstvennye protsessy podzemnoy razrabotki rudnykh mestorozhdeniy [Productive processes in underground ore mining], Moscow, Izd-vo «Gornaya kniga», 2013, 517 p.

12. Kaplunov D. R., Ryl'nikova M. V. Kombinirovannaya razrabotka rudnykh mestorozhdeniy [Hybrid open pit/underground ore mining ], Moscow, Izd-vo «Gornaya kniga», 2012, 344 p.

Our partners

Подписка на рассылку

Раз в месяц Вы будете получать информацию о новом номере журнала, новых книгах издательства, а также о конференциях, форумах и других профессиональных мероприятиях.