Библиографический список:
1. Юнгмейстер Д. А., Ячейкин А. И. Модернизация исполнительного органа тоннелепроходческого механизированного комплекса Herrenknecht S-782 // Горное оборудование и электромеханика. — 2017. — № 3. — С. 3—7.
2. Roby J., Willis D. Achieving fast EPB advance in mixed ground. A study of contributing factors / Proc. North American Tunneling. 2014. Pp. 182—194.
3. Gerasimova V. Underground Engineering and Trenchless Technologies at the Defense of Environment // Procedia Engineering. 2016, vol. 165, pp. 1395—1401. DOI: 10.1016/j.proeng.2016.11.870.
4. Антипов В. В., Антипов Ю. В., Наумов Ю. Н. Комплекс КТПМ-5,6/6,0: новый шаг в проектировании отечественной техники для строительства тоннелей для метрополитенов // Горное оборудование и электромеханика. — 2012. — № 4. — С. 23—26.
5. Zhao J., Gong Q. M., Eisensten Z. Tunnelling through a frequently changing and mixed ground. A case history in Singapore // Tunnelling and Underground Space Technology. 2007, vol. 22, no 4, pp. 388—400. DOI: 10.1016/j.tust.2006.10.002.
6. Balci C., Tumac D. Investigation into the effects of different rocks on rock cuttability by a V-type disc cutter //Tunnelling and underground space technology. 2012, vol. 30, pp. 183—193. DOI: 10.1016/j.tust.2012.02.018.
7. Li F. H., Cai Z. X., Kang Y. L. A theoretical model for estimating the wear of the disc cutter // Applied mechanics and materials. 2011, vol. 90, pp. 2232—2236. DOI: 10.4028/www.scientific. net/AMM.90-93.2232.
8. Rostami J. Study of pressure distribution within the crushed zone in the contact area between rock and disc cutters // International Journal of Rock Mechanics and Mining Sciences. 2013, vol. 57, pp. 172—186. DOI: 10.1016/j.ijrmms.2012.07.031.
9. Cho J. W., Jeon S., Yu S. H., Chang S. H. Optimum spacing of TBM disc cutters. A numerical simulation using the three-dimensional dynamic fracturing method // Tunnelling and Underground Space Technology. 2010, vol. 25, no 3, pp. 230—244. DOI: 10.1016/j.tust.2009.11.007.
10. Yagiz S. Utilizing rock mass properties for predicting TBM performance in hard rock condition //Tunnelling and Underground Space Technology. 2008, vol. 23, no 3, pp. 326—339. DOI: 10.1016/j.tust.2007.04.011.
11. Жабин А. Б., Поляков А. В., Аверин Е. А. Сопоставление отечественных и зарубежных методов расчета усилий на лобовых дисковых шарошках при разрушении горных пород // Горный журнал. — 2018. — № 12. — С. 65—68. DOI: 10.17580/gzh.2018.12.13.
12. Жабин А. Б., Поляков Ан.В., Поляков Ал.В., Фомичев А. Д., Антипов Ю. В. Расчет роторного исполнительного органа тоннелепроходческого механизированного комплекса КТПМ-6,0 // Горное оборудование и электромеханика. — 2012. — № 2, pp. 16—23.
13. Bruland A. Hard rock tunnel boring: PhD Thesis. Trondheim, Norway: Norwegian University of Science and Technology, 1998.
14. Macias F. J. Hard Rock Tunnel Boring: Performance Predictions and Cutter Life Assessments: PhD Thesis. Trondheim, Norway: Norwegian University of Science and Technology, 2016.
15. Rostami J. Development of a force estimation model for rock fragmentation with disc cutters through theoretical modeling and physical measurement of crushed zone pressure: PhD Thesis. Golden, Colorado, USA: Colorado School of Mines, 1997.
16. Balci C. Correlation of rock cutting tests with field performance of a TBM in a highly fractured rock formation. A case study in Kozyatagi-Kadikoy metro tunnel, Turkey // Tunnelling and Underground Space Technology. 2009, vol. 24, no 4, pp. 423—435. DOI: 10.1016/j.tust.2008.12.001.
17. Tumac D., Balci C. Investigations into the cutting characteristics of CCS type disc cutters and the comparison between experimental, theoretical and empirical force estimations // Tunnelling and Underground Space Technology. 2015, vol. 45, pp. 84—98. DOI: 10.1016/j.tust.2014.09.009.
18. Rostami J., Chang S. H. A Closer Look at the Design of Cutterheads for Hard Rock Tunnel-Boring Machines // Engineering. 2017. Т.3, no 6, pp. 892—904. DOI: 10.1016/j.eng.2017.12.009.
19. Frenzel C., Käsling H., Thuro K. Factors influencing disc cutter wear // Geomechanik und Tunnelbau. 2008, vol. 1, no 1, pp. 55—60. DOI: 10.1002/geot.200800006.
20. Жабин А. Б., Поляков Ан. В., Поляков Ал. В., Мурашов В. В. Оптимизация расположения резцов на коронках исполнительных органов проходческих комбайнов // Горный журнал. — 2016. — № 12. — С. 73—82. DOI: 10.17580/gzh.2016.12.16.
21. Huo J., Sun W., Chen J., Zhang X. Disc cutters plane layout design of the full-face rock tunnel boring machine (TBM) based on different layout patterns // Computers & industrial engineering. 2011, vol. 61, no 4, pp. 1209—1225. DOI: 10.1016/j.cie.2011.07.011.
22. Huo J., Hanyang W., Jing Y., Wei S., Guangqing L., Xiaolong S. Multi-directional coupling dynamic characteristics analysis of TBM cutterhead system based on tunnelling field test // Journal of mechanical science and technology. 2015, vol. 29, no 8, pp. 3043—3058. DOI: 10.1007/s12206-015-0701-1.
23. Han M. D., Cai Z. X., Qu C. Y., Jin L. S. Dynamic numerical simulation of cutterhead loads in TBM tunnelling // Tunnelling and Underground Space Technology. 2017, vol. 70, pp. 286—298. DOI: 10.1016/j.tust.2017.08.028.
24. Chen Y., Wei T., Gong T. Research on optimal layout of cutter-head system of rock tunnel-boring machine based on Archimedes spiral theory //Advances in Mechanical Engineering. 2018, vol. 10, no 2, pp. 1—10. DOI: 10.1177/1687814018759352.
25. Geng Q., Bruland A., Macias F. J. Analysis on the relationship between layout and consumption of face cutters on hard rock tunnel boring machines (TBMs) // Rock Mechanics and Rock Engineering. 2018, vol. 51, no 1, pp. 279—297. DOI:10.1007/s00603-017-1320-1.