TITUL PAGES
PUBLISHERS IMPRINT
ROCK FAILURE
P. 5-12
Zakharov V. N., Linnik V. Yu., Linnik Yu. N., Zhabin A. B.
CLASSIFICATION OF COAL SEAMS BY FEATURES OF GEOLOGICAL STRUCTURE AND CHARACTERISTICS OF BREAKING
GEOTECHNOLOGY (UNDERGROUND, OPEN AND CONSTRUCTION)
P. 13-21
Dragunskiy O. N.
BREAKING INVERSIONS IN OPEN PIT MINES USING INDUCED VENTILATION FACILITIES
P. 22-33
Zubov V. P., Kovalski E. R., Antonov S. V., Pachgin V. V.
IMPROVING THE SAFETY OF MINES IN DEVELOPING VERKHNEKAMSK POTASSIUM AND MAGNESIUM SALTS
P. 34-43
Kalybekov T., Rysbekov K. B., Toktarov A. A., Otarbaev O. M.
UNDERGROUND MINE PLANNING WITH REGARD TO PREPAREDNESS OF MINERAL RESERVES
P. 44-50
Shuplik M. N., Vakulenko I. S.
FEATURES OF FROZEN WALL FORMATION AFTER COOLING AGENT DELIVERY TERMINATION IN FREEZING PIPES
MINE AEROGASDYNAMICS
P. 51-58
Fedorov E. V., Shenin D. S.
EXPERIMENTAL EVALUATION DATA ON GAS CONTENT OF WORKING COAL SEAMS IN KIROV MINE
GEOECOLOGY OF MINING INDUSTRY
P. 59-71
Konnova N. I.
COMPOUND PHOSPHORIC–ZEOLITIC FERTILIZERS—A NEW APPROACH TO IMPROVEMENT OF OFFGRADE PHOSPHATE ROCK EFFICIENCY
MARKSHADERING
P. 72-79
Kramarov S. O., Khramov V. V., Mityasova O. Yu.
SATELLITE IDENTIFICATION OF MINERAL DEPOSITS UNDER OPEN PIT MINING
MINING GEOPHYSICS
P. 80-88
Dorokhin К. А.
EXPERIENCE OF BOREHOLE SEISMIC SOUNDING FOR THE ASSESSMENT OF PHYSICAL STATE OF ROCK MASS USING 2D AND 3D REPRESENTATIONS
P. 89-96
Nikolenko P. V., Shkuratnik V. L.
LABORATORY SETUP FOR ULTRASONIC TESTING OF ROCK SAMPLES IN VARIABLE TEMPERATURE AND PRESSURE CONDITIONS
P. 97-110
Lebedev M. O., Romanevich K. V.
ENGINEERING AND GEOPHYSICAL RESEARCH IN RECONSTRUCTION OF UNDERGROUND STRUCTURES
P. 111-123
Trushko V. L., Gospodarikov A. P., Sozonov K. V.
CALCULATION OF STRESS STATE IN ORE AND BACKFILL DURING MINING IN YAKOVLEVSKOE IRON ORE DEPOSIT
P. 124-132
Andrianov S. V.
GPR MONITORING OF SPACE BETWEEN LINING AND ROCK IN UNDERGROUND MINES
P. 133-148
Filimonov K. A., Renev A. A., Kucherenko A. V., Grechishkin P. V.
INFLUENCE OF LONGWALLING ON REINFORCED ROADWAYS IN PILLARS IN YALEVSKY MINE
P. 149-155
Fedorov G. B., Dudchenko O. L., Kurenkov D. S.
CONSTRUCTION OF UNDERGROUND STRUCTURES IN SALINE DEPOSITS USING ACOUSTIC VIBRATIONS
GEOMECHANICS
P. 156-172
Kossovich E. L., Epshtein S. A., Borodich F. M., etc.
CONNECTIONS BETWEEN MICRO/NANO SCALE HETEROGENEITY OF MECHANICAL PROPERTIES OF COALS AND THEIR PROPENSITY TO OUTBURSTS AND CRUSHING
MINING INDUSTRIAL GEOLOGY
P. 173-180
Ageev A. S., Ilalova R. K., Duryagina A. M., Talovina I. V.
A LINK BETWEEN SPATIAL DISTRIBUTION OF THE ACTIVE TECTONIC DISLOCATION AND GROUNDWATER WATER RESOURCES IN THE BAIKAL-STANOVAYA SHEAR ZONE
MINING MACHINERY AND EQUIPMENT
P. 181-188
Atakulov L. N., Sheshko O. E.
IMPROVEMENT OF ECONOMIC EFFICIENCY OF THE HIGH-ANGLE CONVEYOR KNK-270 AT NAVOI MINING AND METALLURGICAL COMBINAT
ENRICHMENT OF MINERALS
P. 189-199
Gzogyan S. R.
MAGNETITE AND QUARTZ SURFACE CONDITION IN FERRO-MAGNETIC SUSPENSION
P. 200-208
Kuznetsova I. N., Lavrinenko A. A., Shrader E. A., Sarkisova L. M.
REDUCTION IN FLOTATIONACTIVE SILICATE RECOVERY IN BULK CONCENTRATE OF LOW-SULPHIDE PLATINUM-METAL ORE
LABOR PROTECTION IN MINING
P. 209-216
Malashkina V. A., Kopylova A.
REVIEW OF PERIODIC EVALUATION OF WORKING ENVIRONMENT IN MINES IN THE REPUBLIC OF KAZAKHSTAN
SPECIAL EDITIONS GIAB
P. 50
Team of authors
UNDERGROUND COAL MINING OF THE XXI CENTURY-3
P. 123
Team of authors
PROBLEMS OF DEVELOPMENT OF GEORESOURCES OF THE RUSSIAN FAR EAST AND COUNTRIES OF THE ASIA-PACIFIC REGION
THE DEPOSITED MANUSCRIPTS
P. 21
Dmitrieva V. V., Frolova A. Yu., Prishepenkov S. A.
DESIGN OF AN INTEGRATED MODEL «BELT CONVEYOR — ELECTRIC DRIVE»
P. 96
Shogenova Z. A.
IMPROVEMENT OF THE TECHNOLOGY OF MANAGEMENT OF DESIGN AND REALIZATION OF DRILLING-EXPLOSION WORKS ON THE BASIS OF USING THREE- DIMENSIONAL MODELS OF THE STRENGTH OF THE MASSIFIES OF MOUNTAIN DEFINITIONS, DETERMINED IN THE PROCESS OF CHARACTERISTICS OF THE ARRAY
P. 172
Dmitrieva V. V., Gavrilov A. A.
MODELING OF SOFT STARTER FOR ASYNCHRONOUS MOTOR