TITUL PAGES
PUBLISHERS IMPRINT
СONTENT
Russian version
GEOTECHNOLOGY (UNDERGROUND, OPEN AND CONSTRUCTION)
P. 5-15
Gavrishev S. E., Zalyadnov V. Yu., Bikteeva N. S.
AREAS OF DIVERSIFICATION FOR A MINING COMPANY
P. 16-22
Danilov O. S., Belov A. V., Grebenyuk I. V.
ASH AND SLAG WASTE PROCESSING WITH EXTRACTION OF RARE METALS AS A KEY FACTOR OF SOCIAL, ECONOMIC AND ECOLOGICAL WELL-BEING IN COAL MINING COUNTRIES
P. 23-32
Makal'skiy L. M., Kukhno A. V., Tsekhanovich O. M.
MINE WATER TREATMENT BY ELECTRICAL DISCHARGE TO REDUCE SALINITY
P. 33-39
Maksimov D. A.
DEFICIENCY OF CURRENT METHODS FOR IMPROVEMENT OF FILTRATION STABILITY OF ROCK-FILL WATERWORKS IN MINING
P. 40-46
Rozanov I. Yu., Zavyalov A. A.
APPLICATION OF IBIS FM RADAR TO PIT WALL MONITORING AT ZHELEZNY OPEN PIT MINE OF KOVDOR MINING AND PROCESSING PLANT
P. 47-53
Sencus V. V., Abramkin N. I., Sencus Val. V.
FEATURES OF ACCESSING COAL BEDS IN HYBRID MINING
P. 54-60
Uvarova V. A.
ECOLOGICAL PROPERTIES OF POLYMERS INVOLVED IN NEW COAL MINING TECHNOLOGIES
MINE AEROGASDYNAMICS
P. 61-68
Kachurin N. M., Ermakov A. Yu., Sencus Val. V.
THEORETICAL JUSTIFICATION OF PHENOMENOLOGICAL LAW OF GAS FLOW RESISTANCE IN ROCK MASS
P. 69-75
Malashkina V. A.
COAL MINE DEGASIFICATION EFFICIENCY ENHANCEMENT TO IMPROVE WORKING CONDITIONS OF MINERS
MARKSHADERING
P. 76-82
Tatarinova O. A.
EVALUATION OF METHOD TO GAIN ACCESS TO COAL DEPOSIT AREAS
MINING GEOPHYSICS
P. 83-88
Gaysin R. M., Tsarikov A. Yu.
ESTIMATE OF INFLUENCE OF DISLOCATION POSITION ON ANOMALOUS SIGNAL INTENSITY IN UNDERGROUND ELECTRICAL SURVEY
MINING MACHINERY AND EQUIPMENT
P. 89-98
Asatryan D. A., Arutyunyan S. S.
MACHINE AND TECHNOLOGY OF CUTTING REGULAR-SHAPE FACE STONE IN MOUNTAINOUS COUNTRIES
P. 99-107
Volkova L. P., Kostin V. N., Pankrushin P. Yu.
REENGINEERING OF ALGORITHM FOR MINING PLOUGH PARAMETERS TO IMPROVE ITS MANEUVERABILITY IN THE PLANE OF A SEAM
P. 108-115
Gorelova A. Yu., Kristal M. G.
FORMATION OF WORKING ERRORS IN MAKING HOLES OF HYDRAULIC CYLINDER BARRELS AS THE TECHNOLOGICALLY HEREDITARY CHARACTERISTIC OF WORK PIECE MANUFACTURING ERROR
P. 116-123
Danilov B. B., Rechkin A. A., Cheshchin D. O.
EXPERIMENTAL POSITIONING OF CONTROLLABLE PNEUMATIC PIERCING MACHINE PIVOT
P. 124-130
Mulukhov K.K., Beslekoeva Z.N.
SERPENTINE TUBULAR WHEEL-AND-BELT CONVEYOR FOR NORELOADING HAULAGE ALONG SPATIALLY CURVED ROUTE
P. 131-138
Khrutskiy A. A., Oshchepkov V. S.
COMPUTER MODELING OF DTH HAMMER P-110 OPERATION
ENRICHMENT OF MINERALS
P. 139-145
Wen Yafeng, Izabaev U. D., Ukubaev A. K., Zavarukhina E. A.
INTRODUCTION OF SELECTIVE COPPER SULPHIDE LEACHING FROM GOLD CONCENTRATE
P. 146-152
Kalyuzhnaya R. V.
OPTIMIZATION OF MAGNETIC-GRAVITY SEPARATION PARAMETERS BASED ON THE STUDIES OF INTERPARTICLE MAGNETIC INTERACTION IN MAGNETICALLY STABILIZED LIQUEFIED LAYER
P. 153-159
Pestryak I. V.
DEVELOPMENT AND JUSTIFICATION OF EFFICIENT METHODS FOR RECYCLING WATER CONDITIONING AT PROCESSING PLANTS
MINING INDUSTRIAL GEOLOGY
P. 160-168
Petrochenkov D. A.
JEWELRY-QUALITY MODIROVAL AMMONITE, MADAGASCAR
P. 169-176
Petrochenkov D. A.
JEWELRY-QUALITY WOOD TIN OF DOMINION CREEK PLACER, CANADA
P. 177-180 (pictures)
ROCK FAILURE
P. 181-188
Kamyansky V. N.
ESTIMATION OF SEISMIC LOAD OF BLASTING ON PIT WALL ROCK MASS DURING BLASTED SLOT MAKING
P. 189-195
Alenichev I. A.
ROCK MASS RESPONSE TO DYNAMIC EFFECT OF BLASTING IN THE AREA OF OPEN PIT MINE
PRODUCTION ORGANIZATION AND MANAGEMENT IN MINING
P. 196-204
Alborov I. D., Petrov Yu. S., Zorina I. Yu.
PRINCIPLES OF ENERGY SUPPLY OF MINING ENTERPRISES USING NATURAL ENERGY RESOURCES OF MOUNTAIN PROVINC
P. 205-211
Lapshin N. S., Vinogradov I. P., Dzyurich D. O.
ANALYSIS OF DEVELOPMENT TREND IN THE MARKET OF NONMETALLIC CONSTRUCTIONAL MATERIALS IN THE RUSSIAN FEDERATION
FIRE AND INDUSTRIAL SAFETY IN MINING
P. 212-218
Ermakov A. Yu., Kachurin N. M., Sencus Val. V.
SYSTEMIC APPROACH TO COAL MINE VENTILATION SAFETY BASED ON AIR/GAS DYNAMICS CONTROL
P. 219-228
Musina V. R.
GEODYNAMIC POSITION OF BURNING COAL-AND-ROCK DUMP AT NESVETAEVSKAYA MINE
SPECIAL EDITIONS GIAB
P. 15
Bui Trung Kien, Kubrin S.S., Bui Thi Thuy Hang
MODERNIZATION AND OPTIMIZATION OF THE WORK OF TRANSPORT OF HONGTHAI - VIETNAM MINE IN THE CONDITIONS OF EXPLOSIVE COAL TREATMENT
P. 53
Artemenko S. I.
LABOR POTENTIAL AS A FACTOR OF INCREASING LABOR PRODUCTIVITY
P. 88
Avksentiev S. Yu., Serzhan S. L., Trufanova I. S.
DETERMINATION OF PARAMETERS OF HYDRAULIC TAILINGS BENEFICIATION OF IRON ORE IN KACHKANAR GOK
P. 130
Temkin I. O., Do Chi Thanh, Agabubaev A.
ON SOME ALGORITHMS FOR THE FUNCTIONING OF THE ANALYTICAL PLATFORM IN THE VENTILATION MANAGEMENT SYSTEM OF THE METHANEMINING MINE
P. 211
Turtygina N. A., Okhrimenko A. V., Koval'chuk A. A., Kalashnikov K. A.
PLANNING OF MINING WORKS AS ORGANIZATIONAL METHOD OF QUALITY MANAGEMENT FOR MINERAL RAW MATERIALS
IN MINING SYSTEM
P. 218
Gusev V. N., Maluhina E. M., Ilyukhin D. A. etc.
OBTAINING ANALYTICAL MODELS AND CALCULATION METHODS APPLICABLE TO SOLVING SURVEYING PROBLEMS
THE DEPOSITED MANUSCRIPTS
P. 46
Slobodnyak T. M., Nikitina O. A.
PLANETARY GEARS DESIGN FOR MINING MACHINES
P. 60
Khakulov V.A., Shogenova Z.A., Al-Mutavakel A.I.
IMPROVEMENT OF CURRENT DESIGNING OF MINING WORKS BASED ON REMOTE MONITORING TECHNICAL CONDITION OF MINING EQUIPMENT
P. 115
Slobodnyak T. M., Nikitina O. A.
ECONOMIC DRIVES FOR MINING MACHINESDESIGN
P. 159
Kozhevnikov N. A., Petrov G. M.
THE STUDY OF ELECTRICAL NETWORKS CAREER «NEVEROVO» WITH GROUNDING SYSTEM TN-C
P. 168
Mikhailov A. V., Dzhafarov K. A.
JUSTIFICATION OF WRENCH-ROTARY METHANE PARAMETERS FOR FITTING MILL STRAPS
P. 188
Zlobin D. A.
MODERNIZATION OF POWER LINES IN AN INTEGRATED SUBSTATION