Bibliography: 1. Nagovitsyn O. V., Lukichev S. V. Temporal approach to modeling objects within a mining technology. Journal of Mining Science. 2020, vol. 6, no. 6, pp. 1046—1052. DOI: 10.1134/ S1062739120060174.
2. Nagovitsyn O. V., Voznyak M. G. Robotic mine management. MIAB. Mining Inf. Anal. Bull. 2021, no. 5-1, pp. 326—335. [In Russ]. DOI: 10.25018/0236_1493_2021_51_0_326.
3. Lukichev S. V., Nagovitsyn O. V., Laptev V. V. Shortand medium term planning of underground mining operations. Proceedings of the 40th International Symposium on Application of Computers and Operations Research in the Mineral Industry, APCOM 2021. 2021, pp. 45—54.
4. Belogorodtsev O. V., Nagovitsyn G. O. Choice of technology and order of mining underground reserves of the Gakman section of the Yukspor deposit. MIAB. Mining Inf. Anal. Bull. 2021, no. 5-1, pp. 19—28. [In Russ]. DOI: 10.25018/0236_1493_2021_51_0_19.
5. Ren Hong-gang, Wei Zheng Application of digital optimum design technology in mining design of a large gold mine in Ethiopia. IOP Conference Series Earth and Environmental Science. 2019, vol. 304, no. 3, article 032087. DOI: 10.1088/1755-1315/304/3/032087.
6. Khomkin E. Е. Automated planning and design of underground mining in MGIS MINEFRAME. Geotekhnologiya i obogashchenie poleznykh iskopaemykh: Materialy VII Konferentsii-shkoly molodykh uchenykh [Geotechnology and mineral processing: Proceedings of VII Conference-School of Young Scientists], Apatity, KNTS RAN, 2016, pp. 46—50. [In Russ].
7. Lukichev S. V., Belogorodtsev O. V. Solving problems of underground mining design using geoinformation technologies. MIAB. Mining Inf. Anal. Bull. 2019, no. S37, pp. 205—213. [In Russ]. DOI: 10.25018/0236-1493-2019-11-37-205-213.
8. Kutovoy S. N., Kataev A. V., Vasenin D. A., Batalov I. A., Svintsov D. I. Automation of surveyor tasks solution within the creation of mining and geological information system of PJSC Uralkali. Nedropol'zovanie. 2021, vol. 21, no. 3, pp. 131—136. [In Russ]. DOI: 10.15593/27128008/2021.3.5.
9. Buzalo N. A., Tsaritova N. G., Platonova I. D., Lysenko V. N. Parametric modeling of structures in visual programming environment. Eurasian Scientific Journal. 2021, vol. 13, no. 4. [In Russ].
10. Barabash M. S., Kievskaya E. I. Principles of parametric modeling of construction objects. Construction & Architecture. 2016, no. 1(01), pp. 16—22. [In Russ]. DOI: 10.18454/ mca.2016.01.4.
11. Pikalov V. A., Sokolovskiy A. V., Tereshina M. A. Challenges of mine designing in conditions of high alterability of the environment. Ugol’. 2022, no. 8, pp. 100—105. [In Russ]. DOI: 10.18796/0041-5790-2022-8-100-105.
12. Farkaš B., Hrastov A. Multi-criteria analysis for the selection of the optimal mining design solution — A case study on quarry «Tambura». Energies. 2021, vol. 14, article 3200. DOI: 10.3390/en14113200.
13. Nesbitt P., Sipeki L., Flamand T., Newman A. M. Optimizing underground mine design with method-dependent precedences. IISE Transactions. 2020, vol. 53, no. 6, pp. 643—656. DOI: 10.1080/24725854.2020.1823534.
14. Nesbitt P., Blake L. R., Lamas P., Goycoolea M., Pagnoncelli B. K., Newman A., Brickey A. Underground mine scheduling under uncertainty. European Journal of Operational Research. 2021, vol. 294, no. 1, pp. 340–352. DOI: 10.1016/j.ejor.2021.01.011.
15. Shek V. M., Voznesensky Y. S., Kravchenko I. A., Zakiev R. M., Litvinov A. G. Development of a computer method for selecting the best option for cutting a mine field. MIAB. Mining Inf. Anal. Bull. 2011, no. S6, pp. 321—326. [In Russ].
16. Lukichev S. V., Nagovitsyn O. V., Bilin A. L., etc. Nauchnye i prakticheskie aspekty primeneniya tsifrovykh tekhnologiy v gornoy promyshlennosti: monografiya [Scientific and practical aspects of digital technologies application in mining industry: monograph], Apatity, Izd-vo FITs KNTs RAN, 2019, 192 p.
17. Lubin A. N., Laptev V. V., Mamtseva O. A. Justification of the excavation capacity in the clearing workings at the Karnasurt mine. MIAB. Mining Inf. Anal. Bull. 2019, special edition 37, pp. 224–232. [In Russ]. DOI: 10.25018/0236-1493-2019-11-37-224-232.
18. Sidorenko A. A., Dmitriyev P. N., Yaroshenko V. V. Integrated justification of technological structure for coal mine. MIAB. Mining Inf. Anal. Bull. 2021, no. 8, pp. 5–22. [In Russ]. DOI: 10.25018/0236_1493_2021_8_0_5.
19. Lukichev S. V., Nagovitsyn O. V., Laptev V. V. Digital tools for underground mine planning: Cut-and-fill mining. Eurasian Mining. 2021, no. 1, pp. 75–78.
20. Belogorodtsev O. V., Savin E. M. Automated planning of underground mining. Voprosy osusheniya, geologii i geoinformatiki, geomekhaniki, spetsial'nykh gornykh rabot i gornykh tekhnologiy: Materialy 12 mezhdunarodnogo simpoziuma «Osvoenie mestorozhdeniy mineral'nykh resursov i podzemnoe stroitel'stvo v slozhnykh gidrogeologicheskikh usloviyakh» [Issues of drainage, geology and geoinformatics, geomechanics, special mining operations and mining technology: Proceedings of the 12th International Symposium on «Mineral Deposit Development and Underground Construction in Complex Hydrogeological Conditions»], Belgorod, OAO «VIOGEM», 2013, pp. 276—283. [In Russ].