Simulation modeling computer-based system for optimizing the parameters of open-pit excavator-dump truck complexes

In article presented computer system for automatic optimization of excavator-dump truck complexes parameters in open pit coalmining. System works on integration of simulation modeling in evolutionary algorithm and multiplicative convolution of optimization criteria in an aggregated form for calculation of mining machines optimal parameters. First system user defines mining conditions, physical and mechanical properties of rocks and experiment parameters. Then system automatically choose select from database mining machines parameters, creates simulation models for accounting of mining machines interaction and conducts simulation experiments in simulation core of GPSS World. System shows results of optimization in user interface as 3D-animation with diagrams of change of open pit coalmining parameters of quarry faces, mining machines and unload points. Computer system determined parameters of excavatordump truck complexes for conditions of coalmining in “Barzas partnership” group in Kuzbass. The system took into account unscheduled downtime for organizational and technical reasons. The optimal parameters of excavator-dump truck complexes have been determined to ensure maximum operational performance with minimal unit costs for loading and transporting rocks.

Keywords: coal mining, mining machines parameters, excavating vehicle complex, optimization, computer-based system, probable downtimes, simulation modeling, simulation experiment, decision making.
For citation:

Kuznetsov I. S., Sinoviev V. V., Nikolayev P. I., Starodubov A. N. Simulation modeling computer-based system for optimizing the parameters of open-pit excavatordump truck complexes. MIAB. Mining Inf. Anal. Bull. 2022;(6—1):304—316. [In Russ]. DOI: 10.25018/0236_1493_2022_61_0_304.

Acknowledgements:

The research is done under financial support of Russian Foundation for Basic Research, project No.19—37—90031.

Issue number: 6
Year: 2022
Page number: 304-316
ISBN: 0236-1493
UDK: 622.-1/-9, 004.94
DOI: 10.25018/0236_1493_2022_61_0_304
Article receipt date: 14.01.2022
Date of review receipt: 30.05.2022
Date of the editorial board′s decision on the article′s publishing: 10.05.2022
About authors:

Kuznetsov I. S., Senior engineer, https://orcid.org/0000-0002-9127-7739, «FRC CCC SB RAS», 650000, Kemerovo, prosp. Sovetskey, 18, Russia, e-mail: is150794@mail.ru;
Sinoviev V. V., Cand. Sci. (Eng.), docent, the Head of Laboratory, https://orcid.org/00000003-2945-7613, «FRC CCC SB RAS», 650000, Kemerovo, prosp. Sovetskey, 18, Russia, e-mail: zv150671@gmail.com;
Nikolayev P. I., Senior engineer, https://orcid.org/0000-0003-3052-5177, «FRC CCC SB RAS», 650000, Kemerovo, prosp. Sovetskey, 18, Russia, e-mail: mrnikolaev@mail.ru;
Starodubov A. N., Cand. Sci. (Eng.), docent, senior researcher, https://orcid.org/0000-00027577-9210, «FRC CCC SB RAS», 650000, Kemerovo, prosp. Sovetskey, 18, Russia, e-mail: a.n.starodubov@gmail.com.

 

For contacts:

Kuznetsov I. S., e-mail: is150794@mail.ru.

Bibliography:

1. Ivashhenko J. A., Subbotin Ju. V., Oveshnikov Ju. M., Avdeev P. B. Overburden stripping and transport machinery at Zashulan coal mine. MIAB. Mining Inf. Anal. Bull. 2021;(3—2):90—98. [In Russ]. DOI: 10.25018/0236_1493_2021_32_0_90.

2. Drygin M. Yu. Solutions for improving productivity of excavating vehicle fleet of Kuzbass. Mining Equipment and Electromechanics. 2021, no. 1, pp. 9—17. [In Russ] DOI: 10.26730/1816-4528-2021-1-9—17

3. Gericke P. B. About the unified diagnostic criteria for detecting defects in electrical machines according to the parameters of mechanical vibrations. News of the Ural State Mining University, 2019, vol. 2(54), pp. 100—106. [In Russ] https://doi.org/10.21440/23072091-2019-2-100—106

4. Babokin G. I. Influence of technical parameters, work conditions and operating mode on energy efficiency of single-bucket exactor. MIAB. Mining Inf. Anal. Bull. 2019;(11):199— 207 [In Russ]. DOI: 10.25018/02361493-2019-11-0-199—207.

5. Fedotenko V. S. Selecting mining and transporting equipment complexes for developing high overburden bench. Bulletin of the Kuzbass State Technical University, 2012, no. 2, pp. 31—36. [in Russ].

6. Voronov A. Ju. Optimization of exploitation productivity of excavating vehicle complexes of open-pit mines. Author’s abstract, Kemerovo, KuzSTU, 2015, 191 p. [in Russ]

7. Kurganov V. M., Gryaznov M. V., Kolobanov S. V. Estimating the functioning reliability of excavating vehicle complexes at the open-pit mine. Journal of Mining Institute, 2020, vol. 241, pp. 10—21. [in Russ]. DOI:10.31897/PMI.2020.1.10.

8. Voronov A. Ju., Khoreshok А. А., Voronov Ju. E., Bujankin A. V., Voronov

A. Ju. Assessment of the operation quality of shovel-truck systems at open-pit coal mines in Kuzbass. Mining Equipment and Electromechanics, 2020, no. 2, pp. 19—26. [in Russ]. DOI: 10.26730/1816-4528-2020-2-19—26.

9. Sinoviev V. V., Kuznetsov I. S., Starodubov A. N. Researching man-computer control of dumping trucks included into excavating vehicle complexes applying simulation, Ugol’, 2021, no.7, pp. 9—12. [in Russ]. DOI: 10.18796/0041-5790-2021-7-9—12.

10. Kuznetsov I. S., Sinoviev V. V., Nikolayev P. I., Kuznetsova A. V. Simulation modeling specialized computer system for researching open and underground geotechnology parameters. Proceedings of the Tenth All-Russian Scientific and Practical Conference on Simulation modeling and its application in Science and Industry “Simulation modeling. Theory and Practice”, 2021, pp. 243—249.

11. Paredis R., Van Mielro S., Vangheluwe H. Translating process interaction world view models to devs: GPSS to (Python(p))devs. Winter simulation conference (WSC), 2020, pp. 2221—2232. DOI:10.1109/WSC48552.2020.9383952.

12. Abu-Abed F. N., Martynov D. V., Sergiyenko S. V., Kordyukov R. Yu. Simulation model for estimating productivity of repairing and diagnostic complexes. Programmniye produkty i systemy, 2015, no. 5, pp. 107—116. [in Russ]. DOI:10.15827/0236— 235X.109.107—116

13. Zhukov Y. I., Khutornaia E. V. Simulation of organizing and carrying out of repair for ship engineering products. IOP Conference Series: Materials Science and Engineering, 2019, vol. 560, no. 1, pp. 1—5. [In Russ]. DOI:10.1088/1757—899X/560/1/012025

14. Grober T., Grober O. Modeling of an interactive distance learning platform by means of modern information technologies. E3S Web of Conferences, 2021, vol. 273, pp. 1—11. [In Russ]. DOI: 10.1051/e3sconf/202127312006.

15. Supriyo R., Mohanty R. P. Optimizing a production plan for underground coal mining: A genetic algorithm application. International Journal of Operational Research, 2021, vol. 41, no. 3, pp.423—445. [In Russ]. DOI: 10.1504/IJOR.2021.116264.

16. Wang H., Tonorio V., Li G. Q., Hou J., Hu N. L. Optimization of trackless equipment scheduling in underground mines using genetic algorithms. Mining metallurgy & exploration, 2020, no. 5, pp. 1531—1544. DOI:10.1007/s42461-020-00285-8.

17. Williams J., Singh J., Kumral M., Ruiseco JR. Exploring Deep Learning for DigLimit Optimization in Open-Pit Mines. Natural Resources Research, 2021, vol. 30, no. 3, pp. 2085—2101. DOI:10.1007/s11053—021—09864-y.

18. Zahmani M. H., Atmani B. Multiple dispatching rules allocation in real time using data mining, genetic algorithms, and simulation. Journal of Scheduling, 2020, vol. 24, no. 2, pp. 175—196. DOI: 10.1007/s10951-020-00664-5.

19. Paithankar A., Chatterjee S., Goodfellow R., Asad M. W. A. Simultaneous stochastic optimization of production sequence and dynamic cut-off grades in an open pit mining operation. Resources Policy, 2020, vol. 66, pp. 1—13. DOI:10.1016/j. resourpol.2020.101634.

20. Zakh Ju.A. Applied tasks for multi-criterial optimization, Moscow, Economic, 2014, 455 p. [in Russ]

21. Belov V. V., Lopatin A. K. The original two criteria’s convolution for the best option’s choosing problem. Modern High Technologies, 2019, no. 8, pp. 14—19. [in Russ]. DOI: 10.17513/snt.37623.

22. Makarov V. N., Anistratov K. Ju. Achievement of the highest record indicators of the monthly production of EKG-18 excavators at open-pit mines of “Stroyservice” JSC. Ugol’, 2019, no. 1, pp. 20—26. [In Russ]. DOI: 10.18796/0041-5790-2019-1-20—26

23. Kuznetsov I. S., Sinoviev V. V., Kuznetsova A. V. Increasing identification accuracy and reliability laws of distributing timing data while modeling excavating vehicle complexes. Bulletin of the Kuzbass State Technical University, 2021, no. 3, pp.113—119. [in Russ]. DOI: 10.26730/1999-4125-2021-3-113—119.

Our partners

Подписка на рассылку

Раз в месяц Вы будете получать информацию о новом номере журнала, новых книгах издательства, а также о конференциях, форумах и других профессиональных мероприятиях.