Justification of parameters of open pit mining using truck-and-shovel systems in the Extreme North

At present the mining industry in Russia has faced some adverse effects. One of the major problems is the impossibility of purchase and maintenance of foreign machinery. It is required to spur engineering and introduction of cutting, loading and hauling equipment of domestic manufacture. This study justifies parameters of an open pit mining system using modern domestic cutting, loading and hauling machines. Justification of such mining system parameters when cutting–loading equipment and motor vehicles are used should be performed for a unified truck-and-shovel system as engineering factors of cutting–loading equipment have influence on the highwall profile in open pits while engineering factors of dump trucks have influence on the spoil bank design. Efficient performance of a mine depends on the trouble-free operation of the truck-and-shovel system. Furthermore, the mine performance greatly depends on the complexity of a mineral deposit being mined. In terms of a structurally complex deposit being mined by the deep-level open pit mining method in the Arctic Zone (Murmansk Region), the rational truck-and-shovel operation flow chart was determined. The loading and hauling circuit parameters were validated, which enabled fuller extraction of ore from the deepest levels in the open pit. Owing to the shortened length of the ramp road, the haulage distance and the hauling time of the dump trucks were reduced, which led to the increment in the net profit of the mine.

Keywords: open pit mining, mining system, work area, ramp road, ruling gradient, cable shovels, hydraulic shovels, dump truck.
For citation:

Loginov E. V., Kara S. V., Masalskiy S. S., Petrov K. D. Justification of parameters of open pit mining using truck-and-shovel systems in the Extreme North. MIAB. Mining Inf. Anal. Bull. 2024;(6):17-30. [In Russ]. DOI: 10.25018/0236_1493_2024_6_0_17.

Acknowledgements:
Issue number: 6
Year: 2024
Page number: 17-30
ISBN: 0236-1493
UDK: 622.33
DOI: 10.25018/0236_1493_2024_6_0_17
Article receipt date: 15.12.2023
Date of review receipt: 18.01.2024
Date of the editorial board′s decision on the article′s publishing: 10.05.2024
About authors:

E.V. Loginov1, Cand. Sci. (Eng.), Assistant Professor, e-mail: loginov_ev@pers.spmi.ru, ORCID ID: 0000-0003-3965-0839,
S.V. Kara, Design Engineer, Separate Subdivision of JSC «NIUIF» in Kirovsk, 184250, Kirovsk, Russia, e-mail: svetakara@mail.ru,
S.S. Masalskiy1, Student, e-mail: 433ckacl750@gmail.com,
K.D. Petrov1, Student, e-mail: kostello.w@gmail.com,
1 Empress Catherine II Saint-Petersburg Mining University, 199106, Saint-Petersburg, Russia.

 

For contacts:

E.V. Loginov, e-mail: loginov_ev@pers.spmi.ru.

Bibliography:

1. Loginov E. V., Masalskiy S. S., Petrov K. D. Justification of technological scheme of work of the complex of extraction and loading equipment and automobile transport in open-pit mining. MIAB. Mining Inf. Anal. Bull. 2023, no. 9-1, pp. 22—34. [In Russ]. DOI: 10.25018/0236_1493_2023_91_0_22.

2. Khoreshok A. A., Litvin O. I., Katsubin A. V. To determine the rational area of application of excavation and loading equipment. Ugol'. 2023, no. 3, pp. 91—95. [In Russ]. DOI: 10.18796/00415790-2023-3-91-95.

3. Gogolynskiy K. V., Gromyka D. S., Kremcheev E. A. A modelling of cyclic thermal and impact loads on excavator bucket. International Review of Mechanical Engineering. 2021, vol. 15, no. 4, pp. 189—196. DOI: 10.15866/ireme.v15i4.20699.

4. Makarov V. N., Anistratov K. Y. Achievement of the highest record indicators of the monthly production of EKG-18 excavators at open-pit mines of «STROYSERVICE» JSC. Ugol'. 2019, no. 1, pp. 20—26. [In Russ]. DOI: 10.18796/0041-5790-2019-1-20-26.

5. Anistratov K. Ju., Lukichev S. V., Isajchenkov A. B. Comparative analysis of the efficiency of using rope and hydraulic excavators. Gornyi Zhurnal. 2020, no. 12, pp. 74—78. [In Russ]. DOI: 10.17580/gzh.2020.12.17.

6. Сherepanov V. A., Zhuravlev A. G. Modern technological and design solutions in mining transport. Problems of Subsoil Use. 2022, no. 4, pp. 75—93. [In Russ]. DOI: 10.25635/2313-1586.2022.04.075.

7. Khazin M. L. Directions of career transport development. Perm Journal of Petroleum and Mining Engineering. 2021, vol. 21, no. 3, pp. 144—150. [In Russ]. DOI: 10.15593/2712-8008/2021.3.7.

8. Burakov A. M., Panishev S. V., Alkova E. L., Khosoev D. V. Experience of using hydraulic excavators in difficult mining, geological and climatic conditions. Russian Mining Industry Journal. 2022, no. 2, pp. 90—96. [In Russ]. DOI: 10.30686/1609-9192-2022-2-90-96/.

9. Rylnikova M. V., Argimbaev K. R., Ligotsky D. N. Exploration of rhenium volcanogenic deposit and technology development. International Journal of Engineering, Transactions A: Basicsthis Link is Disabled. 2021, vol. 34, no. 4, pp. 1052—1065. DOI: 10.5829/IJE.2021.34.04A.32.

10. Litvin O. I., Horeshok A. A., Dubinkin D. M., Markov S. O., Stenin D. V., Tjulenev M. A. Analysis of methods for calculating the productivity of mining hydraulic excavators. Russian Mining Industry Journal. 2022, no. 5, pp. 112—120. [In Russ]. DOI: 10.30686/1609-9192-2022-5-112-120.

11. Fomin S. I., Ivanov V. V., Semenov A. S., Ovsyannikov M. P. Incremental open-pit mining of steeply dipping ore deposits. ARPN Journal of Engineering and Applied Sciences. 2020, vol. 11, no. 15, pp. 1306—1311. http://www.arpnjournals.org/jeas/research_papers/rp_2020/jeas_0620_8231.pdf.

12. Ivanov V. V., Dzjurich D. O. Justification of the parameters of the technological scheme for the development of flooded deposits of building sand. Journal of Mining Institute. 2022, vol. 253, pp. 33—40. [In Russ]. DOI: 10.31897/PMI.2022.3.

13. Drebenstedt C., Argimbaev K. R. Korkinsk brown coal open pit as a case study of endogenous fires. International Journal of Engineering, Transactions A: Basics. 2021, vol. 34, no. 1, pp. 292—304. DOI: 10.5829/ije.2021.34.01a.32.

14. Litvinenko V. S., Petrov E. I., Vasilevskaya D. V., Yakovenko A. V., Naumov I. A., Ratnikov M. A. Assessment of the role of the state in the management of mineral resources. Journal of Mining Institute. 2023, vol. 259, pp. 95—111. [In Russ]. DOI: 10.31897/PMI.2022.100/.

15. Hejase B., Ozguner U. Physics-based simulation and automation of a load-haul-dump operation for an articulated dump truck. Vehicles. 2022, vol. 4, pp. 167—181. DOI: 10.3390/ vehicles4010011.

16. Jung T., Raduenz H., Krus P., J. De Negri V., Lee J. Boom energy recuperation system and control strategy for hydraulic hybrid excavators. Automation in Construction. 2022, vol. 135, pp. 1—20. DOI: 10.1016/j.autcon.2021.104046.

17. Onifade M., Adebisi J. A., Shivute A. P., Genc B. Challenges and applications of digital technology in the mineral industry. Resources Policy. 2023, vol. 85, Part B. DOI: 10.1016/j.resourpol.2023.103978.

18. Yuasa T., Ishikawa M. An optimal design methodology for the trajectory of hydraulic excavators based on genetic algorithm. Journal of Robotics and Mechatronics. 2021, vol. 33, pp. 1248—1254. DOI: 10.20965/jrm.2021.p1248.

19. Ermolaev V. A., Selyukov A. V. Comparison of mining and geological conditions on quarries. Journal of Mining and Geotechnical Engineering. 2018, no. 2(2), pp. 50—65. [In Russ]. DOI: 10.26730/2618-7434-2018-2-50-64.

20. Ligotsky D. N., Argimbaeva K. V. Effect of grain size distribution of tailings during the formation of technogenic deposit on the fragmentation index. Sustainable Development of Mountain Territories. 2023, vol. 15, no. 2, pp. 275—282. DOI: 10.21177/1998-4502-2023-15-2-275-282.

21. Fomin S. I., Govorov A. S. Validation of the chosen cutoff grade value in open pit mine design. MIAB. Mining Inf. Anal. Bull. 2023, no. 12, pp. 169—182. [In Russ]. DOI: 10.25018/0236_1493_ 2023_12_0_169.

22. Li Y., Mu X., Fan R. Multi-objective optimization and simulation of novel working mechanism for face-shovel excavator. International Journal of Intelligent Robotics and Applications. 2021, vol. 5, no. 1, pp. 1—9. DOI: 10.1007/s41315-020-00160-1.

23. Katsubin A. V., Fedotov A. A. Systematization of the mining and geological conditions of the coal-bearing and coal-free zones of the Kuzbass open pits. Journal of Mining and Geotechnical Engineering. 2019, no. 3(6), pp. 60—75. [In Russ]. DOI: 10.26730/2618-7434-2019-3-60-75.

24. Pinciroli L., Baraldi P. Maintenance optimization in industry 4.0. Reliability Engineering & System Safety. 2023, vol. 234, no. 1. DOI: 10.1016/j.ress.2023.109204.

25. Marinin M. A., Rakhmanov R. A., Alenichev I. A., Afanasyev P. I., Sushkova V. I. Effect of grain size distribution of blasted rock on WK-35 shovel performance. MIAB. Mining Inf. Anal. Bull. 2023, no. 6, pp. 111—125. [In Russ]. DOI: 10.25018/0236_1493_2023_6_0_111.

26. Wang X., Sun H., Feng M., Ren Z., Liu J. Dynamic analysis of working device of excavator under limit digging force. Journal of The Institution of Engineers. 2021, vol. 102, no. 5, pp. 1137—1144. DOI: 10.1007/s400н32-021-00725-4/.

27. Loginov E. V., Tyuleneva T. A. Control of quarry parameters to improve the efficiency of hydraulic backhoes. Ugol'. 2022, no. 12, pp. 6—10. [In Russ]. DOI: 10.18796/0041-5790-2021-12-6-10.

28. Akishev A. N., Lel' Iu. I., Bokii I. V., Isakov S. V., Glebov I. A. Kimberlite deposits opencast mining innovative technology with variable geometry of non-mining open pit edges. Izvestiya vysshikh uchebnykh zavedenii. Gornyi zhurnal. 2018, no. 8, pp. 5—15. DOI: 10.21440/0536-1028-20188-5-15.

29. Tarasov P. I., Khazin M. L., Golubev O. V. The evolution of quarry vehicles. Herald of the Ural state university of railway transport. 2021, no. 2, pp. 67—74. [In Russ]. DOI: 10.20291/2079-03922021-2-67-74.

30. Gilani S. O., Sattarvand J., Hajihassani M., Abdullah S. S. A stochastic particle swarm based model for long term production planning of open pit mines considering the geological uncertainty. Resources Policy. 2020, vol. 68, article 101738. DOI: 10.1016/j.resourpol. 2020.101738.

31. Torres L. Case study: simulation and artificial intelligence application for the optimization of the hauling and loading process in an open-pit mining system. IFAC-PapersOnLine. 2022, vol. 55, pp. 265—269. DOI: 10.1016/j.ifacol.2022.12.032.

32. Lel Yu. I., Glebov I. A. Justification of optimal gradient of steeply inclined ramps for all-wheel drive dump trucks used in diamond deposit completion. Russian Mining Industry Journal. 2022, no. 1, pp. 95—99. [In Russ]. DOI: 10.30686/1609-9192-2022-1S-95-99.

33. Anisimov K. A., Nikiforov A. V. Modern technologies of diamondiferous deposits mining. Bulletin of the Tomsk Polytechnic University. Geo Assets Engineering. 2023, vol. 334, no. 1, pp. 196—208. [In Russ]. DOI: 10.18799/24131830/2023/1/3837.

34. Kabanov E. I., Korshunov G. I., Gridina E. B. Algorithmic provisions for data processing under spatial analysis of risk of accidents at hazardous production facilities. Nauchnyy Vestnik Natsional'nogo Gornogo Universiteta. 2019, no. 6, pp. 117—121. [In Russ]. DOI: 10.29202/nvngu/2019-6/17.

35. Kabanov E. I., Tumanov M. V., Smetanin V. S., Romanov K. V. An innovative approach to injury prevention in mining companies through human factor management. Journal of Mining Institute. 2023, vol. 263, pp. 774—784. [In Russ]. https://pmi.spmi.ru/pmi/article/view/16013.

Подписка на рассылку