Bibliography: 1. Goncharenko S. N., Korostelev D. B. Methods and models for integrated estimation of system connection between the nature protection policy efficiency and managerial solutions in the field of use of natural resources. MIAB. Mining Inf. Anal. Bull. 2018, no. 11, pp. 70—76. [In Russ]. DOI: 10.25018/0236-1493-2018-11-0-70-76.
2. Goncharenko S. N., Berdaliev B. A. Methods to predict and estimate residual and technological concentrations of uranium ore in in-situ leaching mining. MIAB. Mining Inf. Anal. Bull. 2018, no. 5, pp. 43—48. [In Russ]. DOI: 10.25018/0236-1493-2018-5-0-43-48.
3. Litvinenko V. S., Leitchenkov G. L., Vasiliev N. I. Anticipated sub-bottom geology of Lake Vostok and technological approaches considered for sampling. Geochemistry. 2020, vol. 80, no. 3, article 125556. DOI: 10.1016/j.chemer.2019.125556.
4. Litvinenko V. S., Dvoynikov M. V. Monitoring and control of the drilling string and bottomhole motor work dynamics. Topical Issues of Rational Use of Natural Resource. Proceedings of the XV International Forum-Contest of Students and Young Researchers under the auspices of UNESCO. Vol. 2. Saint-Petersburg, 2020, pp. 804—809. DOI: 10.1201/9781003014638-42.
5. Dvoynikov М. V., Sidorkin D. I., Yurtaev S. L., Grokhotov E. I., Ulyanov D. S. Drilling of deep and ultra-deep wells for prospecting and exploration of new raw mineral fields. Journal of Mining Institute. 2022, vol. 258, pp. 945—955. [In Russ]. DOI: 10.31897/PMI.2022.55.
6. Dvoynikov M. V., Budovskaya M. E. Development of a hydrocarbon completion system for wells with low bottomhole temperatures for conditions of oil and gas fields in Eastern Siberia. Journal of Mining Institute. 2022, vol. 253, pp. 12—22. [In Russ]. DOI: 10.31897/PMI.2022.4.
7. Leusheva E., Brovkina N., Morenov V. Investigation of non-linear rheological characteristics of barite-free drilling fluids. Fluids. 2021, vol. 6, no. 9. DOI: 10.3390/fluids6090327.
8. Goncharenko S. N., Korostelev D. B. System analysis and prediction of performance efficiency figures and indicators in the area of environmental protection and nature management. MIAB. Mining Inf. Anal. Bull. 2018, no. 9, pp. 104—110. [In Russ]. DOI: 10.25018/0236-14932018-9-0-104-110.
9. Umerbekov Zh. Zh., Goncharenko S. N. Validation of efficiency of the target production safety management model introduction in the mining industry. MIAB. Mining Inf. Anal. Bull. 2019, no. 8, pp. 225—234. [In Russ]. DOI: 10.25018/0236-1493-2019-08-0-225-234.
10. Tarasenko I. A., Kulikova A. A. Kovaleva A. M. On the issue of assessing the automation of control of the parameters of the methane-air mixture. Ugol’. 2022, no. 11, pp. 84—88. [In Russ]. DOI: 10.18796/0041-5790-2022-11-84-88.
11. Kulikova A. A., Kharlamova T. A., Khabarova E. I. Kovaleva A. M. On the issue of assessing the impact of microbiological biocenoses on the geoecological and geotechnical risks of mining enterprises. Ugol’. 2022, no. 4, pp. 67—71. [In Russ]. DOI: 10.18796/0041-57902022-4-67-71.
12. Kupriyanov V. V., Bondarenko I. S. Fuzzy logic in reliability assessment of short-term forecast models for mining equipment. Gornyi Zhurnal. 2021, no. 5, pp. 75—79. [In Russ]. DOI: 10.17580/gzh.2021.05.08.
13. Kulikova E., Ivannikov A. Geographic information systems in geological monitoring during the construction of urban underground structures. Monitoring of Geological Processes and Ecological Condition of the Environment. Monitoring 2019. Proceedings of Conference. 2019. DOI: 10.3997/2214-4609.201903192.
14. Kononov A. V., Goncharenko S. N., Assanov D. A., Maslennikov O. O. Research studying of ultrasonic effects on ion-exchange processes in uranium production by the in-situ leaching method. Tsvetnye Metally. 2020, no. 4, pp. 50—57. [In Russ]. DOI: 10.17580/tsm.2020.04.06.
15. Goncharenko S. N., Lachihina A. B. Monitoring of geoinformation system security incidents in performance supervision and management in industry. MIAB. Mining Inf. Anal. Bull. 2022, no. 3, pp. 108—116. [In Russ]. DOI: 10.25018/0236_1493_2022_3_0_108.
16. Zaytseva E. V. Strategic management in the cement industry. MIAB. Mining Inf. Anal. Bull. 2019, no. 2, pp. 214—220. [In Russ]. DOI: 10.25018/0236-1493-2019-02-0-214-220.
17. Moldashi D. N. Methods and technical solutions for keeping the path of a geotechnological borehole. Mining Science and Technology (Russia). 2021, vol. 6, no. 1, pp. 42—51. [In Russ]. DOI: 10.17073/2500-0632-2021-1-42-51.
18. Nguyen Q. L., Nguyen Q. M., Tran D. T., Bui X. N. Prediction of ground subsidence due to underground mining through time using multilayer feed-forward artificial neural networks and back-propagation algorithm — case study at Mong Duong underground coal mine (Vietnam). Mining Science and Technology (Russia). 2021, vol. 6, no. 4, pp. 241—251. [In Russ]. DOI: 10.17073/2500-0632-2021-4-241-251.
19. Kudaibergen K. Z. Methods and models for creating a market 4PL operator based on a logistics division of a large industrial holding company. Mining Science and Technology (Russia). 2021, vol. 6, no. 2, pp. 90—104. [In Russ]. DOI: 10.17073/2500-0632-2021-2-90-104.
20. Krasyukova E., Aynbinder I., Ivannikov A. A rational approach to the management of underground mining in complex hydrogeological and geomechanical conditions based on a risk assessment. IOP Conference Series: Earth and Environmental Science. 2021, vol. 684, no. 1, article 012006. DOI: 10.1088/1755-1315/684/1/012006.
21. Kondybayeva A. B., Solodov S. V. Tricubic interpolation in scientific data visualization problems. Wave Electronics and its Application in Information and Telecommunication Systems, WECONF 2019. Proceedings of Conference. Saint-Petersburg, 2019, article 8840118. DOI: 10.1109/WECONF.2019.8840118.
22. Bui X. N., Nguyen H., Le Q. T., Le T. N. Forecasting PM2.5 emissions in open-pit minesusing a functional link neural network optimized by various optimization algorithms. Mining Science and Technology (Russia). 2022, vol. 7, no. 2, pp. 111—125. [In Russ]. DOI: 10.17073/ 2500-0632-2022-2-111-125.
23. Kim M. L., Pevzner L. D., Temkin I. O. Development of automatic system for Unmanned Aerial Vehicle (UAV) motion control for mine conditions. Mining Science and Technology (Russia). 2021, vol. 6, no. 3, pp. 203—210. [In Russ]. DOI: 10.17073/2500-0632-2021-3-203-210.
24. Khairutdinov A., Ubysz A., Adigamov A. The concept of geotechnology with a backfill is the path of integrated development of the subsoil. IOP Conference Series: Earth and Environmental Science. 2021, vol. 684, no. 1, article 012007. DOI: 10.1088/1755-1315/684/1/01200.
25. Kongar-Syuryun Ch., Ubysz A., Faradzhov V. Models and algorithms of choice of development technology of deposits when selecting the composition of the backfilling mixture. IOP Conference Series: Earth and Environmental Science. 2021, vol. 684, no. 1, article 012008. DOI: 10.1088/1755-1315/684/1/012008.
26. Le Dinh H., Temkin I. O. Application of PSO and bacterial foraging optimization to speed control PMSM servo systems. IEEE 7th International Conference on Communications and Electronics, ICCE 2018. 2018, article 8465728. DOI 10.1109/CCE.2018.8465728.
27. Trofimov V. An approach to intelligent control of complex industrial processes: An example of ferrous metal industry. Autom Remote Control. 2020, vol. 81, pp. 1856—1864. DOI: 10.1134/S0005117920100057.
28. Temkin I., Deryabin S., Konov I., Kim M. Possible architecture and some neuro-fuzzy algorithms of an intelligent control system for open pit mines transport facilities. Frontiers in Artificial Intelligence and Applications. 2019, vol. 320, pp. 412—420. DOI 10.3233/FAIA190205.
29. Kupriyanov V. V., Matskevich O. A., Bondarenko I. S. Parametric and nonparametric models for predicting off-normal situations in underground mines. MIAB. Mining Inf. Anal. Bull. 2018, no. 3, pp. 200—207. [In Russ]. DOI: 10.25018/0236-1493-2018-3-0-200-207.
30. Temkin I., Myaskov A., Deryabin S., Konov I., Ivannikov A. Design of a digital 3D model of transport—technological environment of open-pit mines based on the common use of telemetric and geospatial information. Sensors. 2021, vol. 21, no. 18, article 6277. DOI: 10.3390/s21186277.
31. Zaytseva E. V., Medyanik N. L Automated integrated production and selling planning at processing plant in the cement industry. MIAB. Mining Inf. Anal. Bull. 2022, no. 2, pp. 111— 123. [In Russ]. DOI: 10.25018/0236_1493_2022_2_0_111.
32. Timofeev A. S., Dvoichenkova G. P., Chernysheva E. N., Popadin E. G. Express method for estimating particle isometricity for quality control ferrosilicium. IOP Conference Series: Earth and Environmental Science. 2020, vol. 459, no. 5, article 052096. DOI: 10.1088/17551315/459/5/052096.
33. Lupiezowiec M., Rybak J., Rozanski Z., Dobrzycki P., Jedrzejczyk W. Design and construction of foundations for industrial facilities in the areas of former post-mining waste dumps. Energies. 2022, vol. 15, no. 16, article 5766. DOI: 10.3390/en15165766.
34. Neudakhina Y., Trofimov V. An ANN-based intelligent system for forecasting monthly electric energy consumption. 3rd International Conference on Control Systems, Mathematical Modeling, Automation and Energy Efficiency, SUMMA 2021. Proceedings of Conference. 2021, pp. 544—547. DOI: 10.1109/SUMMA53307.2021.9632108.
35. Vanin A., Aleshin S., Nasirov R., Novikov D., Tulsky V. Investigation of voltage control at consumers connection points based on smart approach. Information. 2016, vol. 7, no. 3, article 42. DOI 10.3390/info7030042.