Implementation of production potential of high-performance equipment— A key trend of improvement in underground mining of power-generating coal

The Russian and international coal market conditions are analyzed. The challenges of power-generating coal mines are specified. The competitive recoverability of coal mines with enhanced-performance, modern, reliable and high-production equipment is illustrated. The implementation philosophy of the coal mine production potential is formulated. The performance evaluation procedure is proposed and implemented in terms of cutting–loading equipment of Russia’s top coal mines (Yalevsky mine). The main causes of high-production equipment downtimes in mines are analyzed. The reasons of mis-implementation of production potential of modern high-production coal mining equipment are revealed, and the top-priority trends of improvement and efficiency enhancement in underground coal mining are identified. The implementation of the production potential of coal mines requires fulfillment of certain conditions, namely, availability of highly workable reserves and advanced coal mining technologies, compliance of the technologies with geological and geotechnical conditions variable in time and in space within the mining lease limits. The further research aims at structural and parametric optimization of process flows in high-rate mining of flat-pitching gas-bearing coal seams.

Keywords: underground mining, coal seams, longwalls, equipment, technical and economic performance, downtime, productivity.
For citation:

Meshkov A. A., Kazanin O. I., Sidorenko A. A. Implementation of production potential of high-performance equipment—A key trend of improvement in underground mining of power-generating coal. MIAB. Mining Inf. Anal. Bull. 2020;(12):156-165. [In Russ]. DOI: 10.25018/0236-1493-2020-12-0-156-165.

Acknowledgements:
Issue number: 12
Year: 2020
Page number: 156-165
ISBN: 0236-1493
UDK: 622.014.2
DOI: 10.25018/0236-1493-2020-12-0-156-165
Article receipt date: 18.03.2020
Date of review receipt: 10.07.2020
Date of the editorial board′s decision on the article′s publishing: 10.11.2020
About authors:

А.А. Meshkov, Cand. Sci. (Eng.), General Director, JSC SUEK-Kuzbass, 652507, Leninsk-Kuznetskiy, Russia,
O.I. Kazanin1, Dr. Sci. (Eng.), Professor, Dean of Mining faculty,
А.А. Sidorenko1, Cand. Sci. (Eng.), Assistant Professor, e-mail: sidorenkoaa@mail.ru,
1 Saint-Petersburg Mining University, 199106, Saint-Petersburg, Russia.

For contacts:

А.А. Sidorenko, e-mail: sidorenkoaa@mail.ru.

Bibliography:

1. Kopytov A. I., Shaklein S. V. Trends of Kuzbass coal industry improvement strategy. Ugol'. 2018, no 5, pp. 80—86. [In Russ]. DOI: 10.18796/0041-5790-2018-5-80-86.

2. Coal price, available at: https://markets.businessinsider.com/commodities/coal-price (accessed 09.03.2020).

3. Tarazanov I. G. Russia’s coal industry performance for January — December, 2018. Ugol'. 2019, no 3, pp. 64—79. [In Russ]. DOI: 10.18796/0041-5790-2019-3-64-79.

4. Galiyeva N. V. Determination of competitiveness of domestic brands of shearers. MIAB. Mining Inf. Anal. Bull. 2017, no 3, pp. 203—214. [In Russ].

5. Zakharov S. I., Makarova V.A., Yablonsky N. V. Dependence of cost of production processes on the level of use of the equipment at the enterprises of open and underground coal mining. MIAB. Mining Inf. Anal. Bull. 2007, no 8, pp. 141—143. [In Russ].

6. Kazanin O. I., Sidorenko А. А., Meshkov А. А. Organizational and technological principles of realization of the modern high productive longwall equipment capacity. Ugol'. 2019, no 12, pp. 4—13. [In Russ]. DOI 10.18796/0041-5790-2019-12-4-13.

7. Meshkov A. A., Volkov M. A., Ordin A. A., Timoshenko A. M., Botvenko D. V. On record length and productivity of highwall mining the V.D. Yalevsky mine. Ugol'. 2018, no 7, pp. 4—7. [In Russ]. DOI 10.18796/0041-5790-2018-7-4-7.

8. Kopylov K. N., Kubrin S. S., Zakorshmenniy I. M., Reshetniak S. N. Reserves of increase of efficiency of coal extraction sections of coal mine. Ugol'. 2019, no 3, pp. 46—49. [In Russ]. DOI: 10.18796/0041-5790-2019-3-46-49.

9. Razumov E. A. Assessment of factors under the most difficult conditions of conducting mining operations on modern coal mine. Ugol'. 2019, no 10, pp. 16—21. [In Russ]. DOI: 10.18796/0041-5790-2019-10-16-21.

10. Gao Y., Liu D., Zhang X., He M. Analysis and optimization of entry stability in underground longwall mining. Sustainability. 2017. Vol. 9. No 11. Pp. 2079—2088.

11. Longwall production remains steady. Coal Age. 2019. January/February. Pp. 24—28. https://www.coalage.com/flipbooks/january-february-2019.

12. Peng S. S. Longwall mining. 2019. 562 pp. DOI: 10.1201/9780429260049.

Our partners

Подписка на рассылку

Раз в месяц Вы будете получать информацию о новом номере журнала, новых книгах издательства, а также о конференциях, форумах и других профессиональных мероприятиях.