Working results on justification of power shovel–truck system parameters for open pit mines in Kuzbass

This article is a summary of the research aimed at justification of optimal parameters of power shovel–truck systems for open pit mines in Kuzbass. The article presents solutions for such problems as: development of a common formula to calculate an actual output of power shovels with a bucket capacity from 6.3 to 55.8 m3; pilot testing of reliability of calculated results; development of an algorithm and a procedure; determination of optimal parameters of the power shovel–truck system for each model of modern power shovels for geotechnical conditions in Kuzbass; development of a rapid method–nomogram for selecting a type and number of power shovels at the stages of mine planning and design. The curves of the cost to remove one cubic meter overburden and the weight-average size of blasted rocks in the conditions of open pit mining in Kuzbass using trucks and power shovels with the bucket capacity of 6.3–55.8 m3 are plotted for rock categories IV and III. Specific recommendations are given, and all aspects and results of the work, to be useful for both designers and planners of mines, are set forth. The use of the work results can facilitate determination of the optimal parameters of power shovel–truck systems in technical upgrading of open pit mines depending on an assigned objective. 

Keywords: shovel–truck system, technology parameters, power shovel, optimization, cost per unit, parameters for mining systems in Kuzbass, flow diagram, weight-average size of blasted rocks, power shovel output.
For citation:

Chaplygin V. V., Sadykov A. A., Matveev A. V. Working results on justification of power shovel–truck system parameters for open pit mines in Kuzbass. MIAB. Mining Inf. Anal. Bull. 2026;(1):27-42. [In Russ]. DOI: 10.25018/0236_1493_2026_1_0_27.

Acknowledgements:
Issue number: 1
Year: 2026
Page number: 27-42
ISBN: 0236-1493
UDK: 622.271
DOI: 10.25018/0236_1493_2026_1_0_27
Article receipt date: 07.05.2025
Date of review receipt: 10.07.2025
Date of the editorial board′s decision on the article′s publishing: 10.12.2025
About authors:

V.V. Chaplygin1, Cand. Sci. (Eng.), Assistant Professor, Head of Chair, e-mail: chaplygin_vv@sibsiu.ru, ORCID ID: 0009-0001-2949-1929,
A.A. Sadykov1, Cand. Sci. (Eng.), Assistant Professor, e-mail: artur.aleksovich@gmail.com, ORCID ID: 0000-0002-9068-800X,
A.V. Matveev1, Senior Lecturer, e-mail: matveev_av@sibsiu.ru, ORCID ID: 0009-0009-7376-1189,
1 Siberian State Industrial University, Novokuznetsk, 654007, Russia.

 

For contacts:

A.A. Sadykov, e-mail: artur.aleksovich@gmail.com.

Bibliography:

1. Dindarioo S. R., Siami-Irdemoosa E., Frimpong S. Measuring the effectiveness of mining shovels. Mining Engineering. 2016, vol. 68, no. 3, pp. 45—50. DOI: 10.19150/me.6501.

2. Miliy S. M. Evaluation of technology for development of inclined and steep coal deposits in Kuzbass. Journal of Mining and Geotechnical Engineering. 2020, no. 1, pp. 45—73. [In Russ]. DOI: 10.26730/2618-7434-2020-1-45-73.

3. Kolesnikov V., Janočko J. On the issue of classification of methods and schemes of quarry fields opening. Journal of Mining and Geotechnical Engineering. 2020, vol. 2, no. 9, pp. 42—74. DOI: 10.26730/2618-7434-2020-2-42-74.

4. Özdogan M., Özdogan H. Cycle time segments of electric rope shovels — a case study. Scientific Mining Journal. 2019, vol. 58, no. 1, pp. 73—79. DOI: 10.30797/madencilik.537648.

5. Litvin O., Makarov V., Strelnikov A., Tyuleneva E. Study of the backhoe’s digging modes at rock face working-out. E3S Web of Conferences. 2019, vol. 105, article 01024. DOI: 10.1051/e3sconf/201910501024.

6. Bumo-Motswaiso K., Suglo R. S. Economic evaluation of materials handling systems in a deep open pit mine. International Journal of Mining and Mineral Engineering. 2022, vol. 13, no. 1, pp. 37—48. DOI: 10.1504/IJMME.2022.10048883.

7. Bosikov I., Klyuev R., Tavasiev V., Gobeev M. Influence of transport and road complex on the natural-technical system. IOP Conference Series: Materials Science and Engineering. 2020, vol. 918, no. 1, article 012223. DOI: 10.1088/1757-899X/918/1/012223.

8. Hödaverdi T., Akyildiz O. Investigation of blast fragmentation models in a sandstone quarry. Scientific Mining Journal. 2020, vol. 59, no. 3, pp. 145—156. DOI: 10.30797/madencilik.792386.

9. Chaplygin V. V., Sadykov A. A., Matveev A. V. Optimization of parameters of semi-hard overburden excavation by power shovels in open pit mines in Kuzbass. MIAB. Mining Inf. Anal. Bull. 2023, no. 9, pp. 84—98. [In Russ]. DOI: 10.25018/0236_1493_2023_9_0_84.

10. Biryukov A. V., Repin N. Ya., Panachev I. A., Tashkinov A. S. Vremennaya metodika rascheta parametrov vzryvnoy otboyki porod na ugol'nykh razrezakh [A temporary method for calculating the parameters of explosive rock breaking at coal mines], Moscow, 1976, 50 p.

11. Repin N. Ya., Bogatyrev V. P., Butkin V. D., Biryukov A. V., Zvonov A. A. Burovzryvnye raboty na ugol'nykh kar'erakh [Drilling and blasting operations at coal pits], Moscow, Nedra, 1987, 254 p.

12. Tashkinov A. S., Sysoev A. A., Tashkinov I. A. Comparative evaluation of the productivity of quarry excavators in the development of blasted rocks. Bulletin of the Kuzbass State Technical University. 2009, no. 4, pp. 17—20. [In Russ].

13. Kononenko E. A., Isaychenkov A. B. The impact of the lumpiness of the blasted rocks on the performance of the Bucyrus 495HD excavator. Mine Surveying and Subsurface Use. 2014, no. 6, pp. 17—19. [In Russ].

14. Vilkul Yu. G., Peregudov V. V. The influence of the granulometric composition of the exploded rock mass on the technical and economic performance of quarries. Razrabotka rudnykh mestorozhdeniy. 2011, no. 94, pp. 3—7. [In Russ].

15. Kazangapov A. E., Kuttybaev A. E., Samenov G., Petrun'ko A. N. Dependence of excavator performance on the lumpiness of the blasted rock at the Zhitikarinsky quarry. Vestnik Kazakhskogo natsional’nogo tekhnicheskogo universiteta im. K.I. Satpaeva. 2006, no. 2, pp. 153—156. [In Russ].

16. Hai X., Funchun L., Jiangnan L., Taoying L. Research on selection and matching of truck-shovel in oversized open-pit mines. Applied Sciences. 2023, no. 13, no. 6, pp. 1—11. DOI: 10.3390/app13063851.

17. Fedotenko V. S., Chaplygin V. V., Matveev A. V. Optimization of the parameters of the technology for the development of semi-horizontal overburden by excavator-automotive complexes using mechanical shovels. Mine Surveying and Subsurface Use. 2024, no. 1(129), pp. 17—31. [In Russ]. DOI: 10.56195/20793332_2024_1_17_31.

18. Vysochyn I., Sytnyk H., Zhuk T., Mazur Yu., Shykova L., Gordeyeva Ye. Information tools for enterprise management in Economics 4.0. Naukovyi visnyk Natsionalnoho hirnychoho universytetu. 2022, no. 3, pp. 141—145.

19. Kovalchuk V. A., Kovalchuk T. M. The economic-mathematical modeling of the optimal structure of investment of a mining and dressing enterprise. Business Inform. 2020, no. 2(505), pp. 108—114.

20. Matveev A. V. Parameters of the technology for the development of semi-basement rocks by excavator-automobile complexes for Kuzbass sections. Subsoil use of the XXI century. Nedropolzovanie — XXI vek. 2024, no. 2(103), pp. 88—93. [In Russ].

Подписка на рассылку

Подпишитесь на рассылку, чтобы получать важную информацию для авторов и рецензентов.